Bolivar County, MS
Bolivar County Road Improvement Project
The project consists of construction of asphalt overlay on 23.995 miles on eight existing asphalt roads throughout Bolivar County. Asphalt base repair, asphalt overlay, and concrete curb & gutter removal and replacement throughout Eastgate Subdivision, the roadbed reclamation of 2.55 miles of existing asphalt on Rosemary Road, and the reconstruction and asphalt overlay of 4.07 miles of existing asphalt on Township Road, 0.45 miles of existing asphalt on Peavine Road, and 1.11 miles of existing asphalt on Prewitt Road.
Details
Funding Source: ARPA Funds, Bolivar County
Cost: $11,828,240.00
Completed: 2023
- Surveying
- Material Testing
- Design
- Construction Inspection
- Construction Stakeout