
Cleveland, MS
Pemble Road Bridge Project
Prepared plans and specifications along with the construction of 0.273 miles of bridge and approaches on Pemble Road, including new asphalt pavement, guardrails, and storm drainage structures.
Details
Funding Source: Emergency Road and Bridge Repair Fund (ERBR), SAP Funds
Cost: $2,283,995.34
Completed: 2021
- Surveying
- Material Testing
- Design
- Construction Inspection
- Construction Stakeout


